Residential Envelope complete — fit-out continuing 2025–26

Steel Mountain Villa — new-build EIFS envelope with 8-inch continuous insulation

Private homeowner · Catskills, NY

Builder — steel-framed new construction

EIFS & stuccoGeneral construction

After: the finished two-tone EIFS envelope, November 2025
After: the finished two-tone EIFS envelope, November 2025

Scope

A new steel-framed hillside residence with a Sto warranted EIFS envelope over 8 inches of continuous insulation, finished in two decorative coats — a granite-effect finish on the cantilevered volumes and a limestone-effect finish on the lower walls — with thermally broken aluminum windows and radiant floor heating.

Challenge
Deep continuous insulation on a steel frame, long cantilevers where the two finishes meet, and mountain weather that limits basecoat and finish-coat days.
Solution
Scaffold towers around the full perimeter, basecoat and mesh carried through every panel joint, and finish coats scheduled by elevation for the right temperatures.
Result
Foundation 2024, steel frame 2024, EIFS envelope finished fall 2025; interior fit-out continuing in 2026.

8 photographs — before, during and after. Click any photo to enlarge.

Video

Pouring and screeding the slab
Steel Mountain Villa, Catskills — May 2025
The finished EIFS envelope, walk-around
Steel Mountain Villa — February 2026

More projects like this

All projects
After: the repainted grandstand from the field, July 2026
Public works Complete 2026

Casey Stadium — exterior steel & EIFS repaint

University at Albany (SUNY) · Albany, NY

Prime contractor — competitively bid, bonded, prevailing wage

Complete exterior repaint of the stadium's structural steel — seating supports, railings, stair stringers and canopies — and of its EIFS wall surfaces, in the university's purple and gold. Steel: cleaning and pressure washing of chalked coatings, mechanical removal of failed film, epoxy spot-priming of rust at base plates and welds, and waterborne alkyd-urethane enamel topcoats. EIFS: pressure washing, crack and impact repair, and a breathable elastomeric masonry coating matched to the campus colors. Change-order work included the box-office canopy and an additional guardrail.

Coatings & paintingEIFS & stucco

Campus entrance sign at the April 2026 field survey — fabrication and installation follow in fall 2026
Public works Awarded — fall 2026 2026

Campus-wide exterior signage repair

SUNY Oswego · Oswego, NY

Prime contractor (general construction) — competitively bid IFB, OSC-approved contract

Repair and replacement of deteriorated exterior campus signage across the SUNY Oswego campus, delivered as general contractor with a signage fabrication partner as subcontractor: field survey and measurements, fabrication drawings and submittals, and on-campus installation under prevailing-wage requirements.

SignageGeneral construction

The storefront columns and band before the stucco repair and decorative finish, August 2026
Storefront elevation at the plaza, August 2026
Commercial Substantially complete 2026

Storefront stucco repair & decorative finish — Stuyvesant Plaza

Hirsch Construction Corp. (GC) for a national mattress retailer · 1475 Western Avenue, Albany, NY

Subcontractor to the general contractor

Repair of the existing storefront stucco, CMU and EIFS at a plaza tenant space, two site-matched decorative finish colors, and a change order for additional finish-coat areas — billed through the GC's Procore requisitions with COI compliance managed through the GC's insurance portal.

EIFS & stucco

Next step

Have a project or a bid package?

Send us the plans, the RFP link or a few photos. You'll get a site visit scheduled and a written proposal — and a certificate of insurance within one business day when you need one.