Residential Complete 2026

Stucco & kickout flashing repair at a chimney

Private homeowner · Niskayuna, NY

Prime contractor

EIFS & stuccoRestoration & waterproofing

Site assessment at the chimney, September 2026
Site assessment at the chimney, September 2026

Scope

Removal of damaged stucco at a roof-to-wall connection beside the chimney, new roof-to-wall and kickout flashing with drip edge, stucco rebuilt at the new flashing and a fresh finish coat over the full wall area so the repair doesn't show.

Challenge
Leaks during heavy rain traced to missing kickout flashing on a home the owners had bought a year earlier.
Solution
Fix the flashing, then the stucco — and re-finish the whole area rather than a patch.
Result
Completed September 2026, including a change order to replace a small area of damaged EIFS found once the wall was opened.

More projects like this

All projects
After: the repainted grandstand from the field, July 2026
Public works Complete 2026

Casey Stadium — exterior steel & EIFS repaint

University at Albany (SUNY) · Albany, NY

Prime contractor — competitively bid, bonded, prevailing wage

Complete exterior repaint of the stadium's structural steel — seating supports, railings, stair stringers and canopies — and of its EIFS wall surfaces, in the university's purple and gold. Steel: cleaning and pressure washing of chalked coatings, mechanical removal of failed film, epoxy spot-priming of rust at base plates and welds, and waterborne alkyd-urethane enamel topcoats. EIFS: pressure washing, crack and impact repair, and a breathable elastomeric masonry coating matched to the campus colors. Change-order work included the box-office canopy and an additional guardrail.

Coatings & paintingEIFS & stucco

After: the cleaned and repointed limestone front of the Wedgeway, October 22, 2026
Commercial Complete 2026

Wedgeway & Kresge Buildings — limestone facade restoration & cleaning

Cass Hill Development Co. · Schenectady, NY

Prime contractor under owner purchase order

Exterior restoration of two adjoining downtown buildings at 271–277 State Street: repointing of every failed joint in the Wedgeway's limestone front with a color-matched Type N mortar, restoration cleaning (PROSOCO masonry cleaners) and sealing of the stone, rebuilding of two damaged stone corners, cleaning and repainting of the marquee steel, first-floor stucco/EIFS repair matched to the existing color and texture, and facade cleaning and EIFS repair on the Kresge building next door.

Restoration & waterproofingMasonryEIFS & stuccoCoatings & painting

The Argus Building clock tower, seen from the lift, September 2026
Commercial Complete 2026

The Argus Building — historic cornice & tower clock restoration

Building owner, through the project's general contractor · Albany, NY

Restoration subcontractor

Localized restoration at the top of the Argus Building, 412 Broadway at Beaver Street: removal of rotted soffit, fascia and decorative wood brackets at the cornice; replacement members milled to match the existing 19th-century profiles; epoxy consolidation of the wood worth saving; and restoration of the tower clock face — new custom-cut round glass, repaired wood surround and trim, hands re-set — all primed and left weather-tight.

Restoration & waterproofing

Next step

Have a project or a bid package?

Send us the plans, the RFP link or a few photos. You'll get a site visit scheduled and a written proposal — and a certificate of insurance within one business day when you need one.