Residential Complete 2026

Stucco & kickout flashing repair at a chimney

Private homeowner · Niskayuna, NY

Prime contractor

EIFS & stuccoRestoration & waterproofing

Site assessment at the chimney, September 2026
Site assessment at the chimney, September 2026

Scope

Removal of damaged stucco at a roof-to-wall connection beside the chimney, new roof-to-wall and kickout flashing with drip edge, stucco rebuilt at the new flashing and a fresh finish coat over the full wall area so the repair doesn't show.

Challenge
Leaks during heavy rain traced to missing kickout flashing on a home the owners had bought a year earlier.
Solution
Fix the flashing, then the stucco — and re-finish the whole area rather than a patch.
Result
Completed September 2026, including a change order to replace a small area of damaged EIFS found once the wall was opened.

More projects like this

All projects
After: the repainted grandstand from the field, July 2026
Public works Complete 2026

Casey Stadium — exterior steel & EIFS repaint

University at Albany (SUNY) · Albany, NY

Prime contractor — competitively bid, bonded, prevailing wage

Complete exterior repaint of the stadium's structural steel — seating supports, railings, stair stringers and canopies — and of its EIFS wall surfaces, in the university's purple and gold. Steel: cleaning and pressure washing of chalked coatings, mechanical removal of failed film, epoxy spot-priming of rust at base plates and welds, and waterborne alkyd-urethane enamel topcoats. EIFS: pressure washing, crack and impact repair, and a breathable elastomeric masonry coating matched to the campus colors. Change-order work included the box-office canopy and an additional guardrail.

Coatings & paintingEIFS & stucco

After: the rebuilt and repointed north elevation, August 2026
Public works Complete 2026

332 Ninth Street — north elevation masonry rebuild

Troy Community Land Bank Corporation · Troy, NY

Prime contractor — RFP award, contract executed with the land bank board; masonry subcontracted

Repair and partial rebuild of a deteriorated north-elevation masonry wall on a land-bank-owned building: selective demolition, brick rebuild and repointing, helical-tie anchoring per the engineer's details, and City of Troy permitting and insurance requirements. Masonry by our subcontracted mason under TDCG supervision.

MasonryRestoration & waterproofing

After: brick retaining wall pressure-washed and efflorescence removed, July 2026
Before: efflorescence on the same wall, July 2026After: a replaced sidewalk panel, August 2026Before: heaved, spalled panel on a route to the emergency department
Commercial Complete 2026

Sidewalk replacements & retaining-wall cleaning

Ellis Medicine · Nott Street and Rosa Road, Schenectady, NY

Prime contractor under hospital purchase orders

Three full sidewalk panel replacements and seven interim patch repairs on the hospital campus; pressure washing and efflorescence removal on brick retaining walls; trip-hazard grinding on the Rosa Road sidewalk. A further purchase order for site-wall washing and coping-stone reset follows in fall 2026.

ConcreteRestoration & waterproofing