Residential Complete 2021–22

Blackberry — gable house with wraparound deck

Private owner · Stamford, NY (Catskills)

Design-build — new construction from foundation to furnishings

General constructionEIFS & stuccoConcrete

The gable house and wraparound deck in winter, February 2024
The gable house and wraparound deck in winter, February 2024

Scope

A stucco-finished gable house on a meadow with a wraparound deck on posts, a vaulted great room with a wall of glass, an open kitchen with granite counters, a deck-side hot tub, marble-tile baths and a walk-out lower level. Poured foundation, wood framing, an exterior insulation and finish system (EIFS) stucco envelope, and cold-climate mini-splits.

Challenge
Open meadow, full winter exposure and a vaulted room with a two-story glass gable — the envelope and the framing had to work together to keep the house warm and the glass wall stable.
Solution
Engineered gable framing for the glass wall, an EIFS envelope detailed at every window, and a wraparound deck carried on its own posts and footings.
Result
Completed 2022; furnished and operating as a vacation rental.

11 photographs — before, during and after. Click any photo to enlarge.

More projects like this

All projects
After: the repainted grandstand from the field, July 2026
Public works Complete 2026

Casey Stadium — exterior steel & EIFS repaint

University at Albany (SUNY) · Albany, NY

Prime contractor — competitively bid, bonded, prevailing wage

Complete exterior repaint of the stadium's structural steel — seating supports, railings, stair stringers and canopies — and of its EIFS wall surfaces, in the university's purple and gold. Steel: cleaning and pressure washing of chalked coatings, mechanical removal of failed film, epoxy spot-priming of rust at base plates and welds, and waterborne alkyd-urethane enamel topcoats. EIFS: pressure washing, crack and impact repair, and a breathable elastomeric masonry coating matched to the campus colors. Change-order work included the box-office canopy and an additional guardrail.

Coatings & paintingEIFS & stucco

Campus entrance sign at the April 2026 field survey — fabrication and installation follow in fall 2026
Public works Awarded — fall 2026 2026

Campus-wide exterior signage repair

SUNY Oswego · Oswego, NY

Prime contractor (general construction) — competitively bid IFB, OSC-approved contract

Repair and replacement of deteriorated exterior campus signage across the SUNY Oswego campus, delivered as general contractor with a signage fabrication partner as subcontractor: field survey and measurements, fabrication drawings and submittals, and on-campus installation under prevailing-wage requirements.

SignageGeneral construction

After: new entry stairs, accessible ramp and steel guardrails, June 2026
Public works Complete 2026

Nathan Lebron Early Learning Center — concrete stairs, ramps & ADA railings

Albany Community Action Partnership (ACAP) · 170 Ontario Street, Albany, NY

Prime contractor — competitive proposal

Replacement of concrete entry stairs, landings and accessible ramps at an occupied early-learning center, followed by a change order for new code-compliant steel pipe guardrails and handrails required by the building department's ADA review. Permit application and stair-layout drawings prepared by TDCG.

Concrete

Next step