Residential Complete 2021–22

Blackberry — gable house with wraparound deck

Private owner · Stamford, NY (Catskills)

Design-build — new construction from foundation to furnishings

General constructionEIFS & stuccoConcrete

The gable house and wraparound deck in winter, February 2024
The gable house and wraparound deck in winter, February 2024

Scope

A stucco-finished gable house on a meadow with a wraparound deck on posts, a vaulted great room with a wall of glass, an open kitchen with granite counters, a deck-side hot tub, marble-tile baths and a walk-out lower level. Poured foundation, wood framing, an exterior insulation and finish system (EIFS) stucco envelope, and cold-climate mini-splits.

Challenge
Open meadow, full winter exposure and a vaulted room with a two-story glass gable — the envelope and the framing had to work together to keep the house warm and the glass wall stable.
Solution
Engineered gable framing for the glass wall, an EIFS envelope detailed at every window, and a wraparound deck carried on its own posts and footings.
Result
Completed 2022; furnished and operating as a vacation rental.

11 photographs — before, during and after. Click any photo to enlarge.

More projects like this

All projects
After: the repainted grandstand from the field, July 2026
Public works Complete 2026

Casey Stadium — exterior steel & EIFS repaint

University at Albany (SUNY) · Albany, NY

Prime contractor — competitively bid, bonded, prevailing wage

Complete exterior repaint of the stadium's structural steel — seating supports, railings, stair stringers and canopies — and of its EIFS wall surfaces, in the university's purple and gold. Steel: cleaning and pressure washing of chalked coatings, mechanical removal of failed film, epoxy spot-priming of rust at base plates and welds, and waterborne alkyd-urethane enamel topcoats. EIFS: pressure washing, crack and impact repair, and a breathable elastomeric masonry coating matched to the campus colors. Change-order work included the box-office canopy and an additional guardrail.

Coatings & paintingEIFS & stucco

After: the cleaned and repointed limestone front of the Wedgeway, October 22, 2026
Commercial Complete 2026

Wedgeway & Kresge Buildings — limestone facade restoration & cleaning

Cass Hill Development Co. · Schenectady, NY

Prime contractor under owner purchase order

Exterior restoration of two adjoining downtown buildings at 271–277 State Street: repointing of every failed joint in the Wedgeway's limestone front with a color-matched Type N mortar, restoration cleaning (PROSOCO masonry cleaners) and sealing of the stone, rebuilding of two damaged stone corners, cleaning and repainting of the marquee steel, first-floor stucco/EIFS repair matched to the existing color and texture, and facade cleaning and EIFS repair on the Kresge building next door.

Restoration & waterproofingMasonryEIFS & stuccoCoatings & painting

Campus entrance sign at the April 2026 field survey — fabrication and installation follow in fall 2026
Public works Awarded — fall 2026 2026

Campus-wide exterior signage repair

SUNY Oswego · Oswego, NY

Prime contractor (general construction) — competitively bid IFB, OSC-approved contract

Repair and replacement of deteriorated exterior campus signage across the SUNY Oswego campus, delivered as general contractor with a signage fabrication partner as subcontractor: field survey and measurements, fabrication drawings and submittals, and on-campus installation under prevailing-wage requirements.

SignageGeneral construction