Public works Complete 2026

332 Ninth Street — north elevation masonry rebuild

Troy Community Land Bank Corporation · Troy, NY

Prime contractor — RFP award, contract executed with the land bank board; masonry subcontracted

MasonryRestoration & waterproofing

After: the rebuilt and repointed north elevation, August 2026
After: the rebuilt and repointed north elevation, August 2026

Scope

Repair and partial rebuild of a deteriorated north-elevation masonry wall on a land-bank-owned building: selective demolition, brick rebuild and repointing, helical-tie anchoring per the engineer's details, and City of Troy permitting and insurance requirements. Masonry by our subcontracted mason under TDCG supervision.

Challenge
A structurally compromised wall on a narrow urban lot, work that could not begin until the state's environmental paperwork cleared, and an engineer's mid-project review that revised the tie-back detail.
Solution
The wall was brought into conformance with the revised engineering — additional helical ties installed course by course — with progress documented in photos at every draw.
Result
Project complete; final invoice issued in August 2026. The land bank has since invited TDCG to price additional properties.

7 photographs — before, during and after. Click any photo to enlarge.

More projects like this

All projects
After: the repainted grandstand from the field, July 2026
Public works Complete 2026

Casey Stadium — exterior steel & EIFS repaint

University at Albany (SUNY) · Albany, NY

Prime contractor — competitively bid, bonded, prevailing wage

Complete exterior repaint of the stadium's structural steel — seating supports, railings, stair stringers and canopies — and of its EIFS wall surfaces, in the university's purple and gold. Steel: cleaning and pressure washing of chalked coatings, mechanical removal of failed film, epoxy spot-priming of rust at base plates and welds, and waterborne alkyd-urethane enamel topcoats. EIFS: pressure washing, crack and impact repair, and a breathable elastomeric masonry coating matched to the campus colors. Change-order work included the box-office canopy and an additional guardrail.

Coatings & paintingEIFS & stucco

After: the cleaned and repointed limestone front of the Wedgeway, October 22, 2026
Commercial Complete 2026

Wedgeway & Kresge Buildings — limestone facade restoration & cleaning

Cass Hill Development Co. · Schenectady, NY

Prime contractor under owner purchase order

Exterior restoration of two adjoining downtown buildings at 271–277 State Street: repointing of every failed joint in the Wedgeway's limestone front with a color-matched Type N mortar, restoration cleaning (PROSOCO masonry cleaners) and sealing of the stone, rebuilding of two damaged stone corners, cleaning and repainting of the marquee steel, first-floor stucco/EIFS repair matched to the existing color and texture, and facade cleaning and EIFS repair on the Kresge building next door.

Restoration & waterproofingMasonryEIFS & stuccoCoatings & painting

The Argus Building clock tower, seen from the lift, September 2026
Commercial Complete 2026

The Argus Building — historic cornice & tower clock restoration

Building owner, through the project's general contractor · Albany, NY

Restoration subcontractor

Localized restoration at the top of the Argus Building, 412 Broadway at Beaver Street: removal of rotted soffit, fascia and decorative wood brackets at the cornice; replacement members milled to match the existing 19th-century profiles; epoxy consolidation of the wood worth saving; and restoration of the tower clock face — new custom-cut round glass, repaired wood surround and trim, hands re-set — all primed and left weather-tight.

Restoration & waterproofing