Commercial Complete 2026

Sidewalk replacements & retaining-wall cleaning

Ellis Medicine · Nott Street and Rosa Road, Schenectady, NY

Prime contractor under hospital purchase orders

ConcreteRestoration & waterproofing

After: brick retaining wall pressure-washed and efflorescence removed, July 2026
After: brick retaining wall pressure-washed and efflorescence removed, July 2026

Scope

Three full sidewalk panel replacements and seven interim patch repairs on the hospital campus; pressure washing and efflorescence removal on brick retaining walls; trip-hazard grinding on the Rosa Road sidewalk. A further purchase order for site-wall washing and coping-stone reset follows in fall 2026.

Challenge
Pedestrian routes to an emergency department that cannot close, and a patch-versus-replace decision on every location.
Solution
Locations marked and photographed with the facilities manager, replacements where the subgrade had failed, honest 'temporary repair — no warranty' language on the patches, and short closures with covered walkways.
Result
Sidewalk and retaining-wall purchase orders complete and invoiced with completion photos, summer 2026.

4 photographs — before, during and after. Click any photo to enlarge.

More projects like this

All projects
After: the cleaned and repointed limestone front of the Wedgeway, October 22, 2026
Commercial Complete 2026

Wedgeway & Kresge Buildings — limestone facade restoration & cleaning

Cass Hill Development Co. · Schenectady, NY

Prime contractor under owner purchase order

Exterior restoration of two adjoining downtown buildings at 271–277 State Street: repointing of every failed joint in the Wedgeway's limestone front with a color-matched Type N mortar, restoration cleaning (PROSOCO masonry cleaners) and sealing of the stone, rebuilding of two damaged stone corners, cleaning and repainting of the marquee steel, first-floor stucco/EIFS repair matched to the existing color and texture, and facade cleaning and EIFS repair on the Kresge building next door.

Restoration & waterproofingMasonryEIFS & stuccoCoatings & painting

The Argus Building clock tower, seen from the lift, September 2026
Commercial Complete 2026

The Argus Building — historic cornice & tower clock restoration

Building owner, through the project's general contractor · Albany, NY

Restoration subcontractor

Localized restoration at the top of the Argus Building, 412 Broadway at Beaver Street: removal of rotted soffit, fascia and decorative wood brackets at the cornice; replacement members milled to match the existing 19th-century profiles; epoxy consolidation of the wood worth saving; and restoration of the tower clock face — new custom-cut round glass, repaired wood surround and trim, hands re-set — all primed and left weather-tight.

Restoration & waterproofing

After: the rebuilt and repointed north elevation, August 2026
Public works Complete 2026

332 Ninth Street — north elevation masonry rebuild

Troy Community Land Bank Corporation · Troy, NY

Prime contractor — RFP award, contract executed with the land bank board; masonry subcontracted

Repair and partial rebuild of a deteriorated north-elevation masonry wall on a land-bank-owned building: selective demolition, brick rebuild and repointing, helical-tie anchoring per the engineer's details, and City of Troy permitting and insurance requirements. Masonry by our subcontracted mason under TDCG supervision.

MasonryRestoration & waterproofing

Next step

Have a project or a bid package?

Send us the plans, the RFP link or a few photos. You'll get a site visit scheduled and a written proposal — and a certificate of insurance within one business day when you need one.