Commercial Complete 2026

Pay-for-parking equipment island

Ellis Medicine · 1101 Nott Street, Schenectady, NY

Prime contractor under hospital purchase order

Concrete

After: the finished equipment island under the garage deck, August 2026
After: the finished equipment island under the garage deck, August 2026

Scope

A new reinforced concrete island under the parking-garage deck for the hospital's pay-station equipment, tapering from six to twelve inches to follow the slope, plus four equipment pads on grade, steel bollards and conduit stub-ups for the electrical contractor. Asphalt cut, existing slab exposed, mats set and concrete placed by trailer pump.

Challenge
Working inside an active hospital parking garage with traffic control, low headroom for placement, and a slab that turned out to be twelve inches thick on one side and five on the other.
Solution
Barricaded work zone, pump placement, and a crack-resistant mix with reinforcement set to suit the varying depth.
Result
Complete and invoiced August 2026 — one of several 2026 purchase orders from the hospital's facilities department.

4 photographs — before, during and after. Click any photo to enlarge.

More projects like this

All projects
After: new entry stairs, accessible ramp and steel guardrails, June 2026
Public works Complete 2026

Nathan Lebron Early Learning Center — concrete stairs, ramps & ADA railings

Albany Community Action Partnership (ACAP) · 170 Ontario Street, Albany, NY

Prime contractor — competitive proposal

Replacement of concrete entry stairs, landings and accessible ramps at an occupied early-learning center, followed by a change order for new code-compliant steel pipe guardrails and handrails required by the building department's ADA review. Permit application and stair-layout drawings prepared by TDCG.

Concrete

After: brick retaining wall pressure-washed and efflorescence removed, July 2026
Before: efflorescence on the same wall, July 2026After: a replaced sidewalk panel, August 2026Before: heaved, spalled panel on a route to the emergency department
Commercial Complete 2026

Sidewalk replacements & retaining-wall cleaning

Ellis Medicine · Nott Street and Rosa Road, Schenectady, NY

Prime contractor under hospital purchase orders

Three full sidewalk panel replacements and seven interim patch repairs on the hospital campus; pressure washing and efflorescence removal on brick retaining walls; trip-hazard grinding on the Rosa Road sidewalk. A further purchase order for site-wall washing and coping-stone reset follows in fall 2026.

ConcreteRestoration & waterproofing

Next step